In the joint application, the best management practices (BMPs), size of pipe flumes for stream crossings, and design of the required silt fences are based on engineering calculations of a 5-year storm event.1 CP considered 2-year, 5-year, and 10-year storm events, but is assuming a 5-year storm event as the basis for their 401 water quality certificate, and 4 related permits. There is no rational basis for this assumption.

Click here to download the pdf of this document (if the file does not load to the right.)

Print Friendly, PDF & Email