If the DEC were to approve the permits for the Constitution Pipeline, DEC would be giving a thumbs-up to clear-cutting 1,000 acres of forested land in New York. Assuming ten feet between each tree, this would mean a loss of 436,000 trees. Assuming six feet between each tree, the pipeline would take more than 1.2 million trees.

Click here to download the pdf of this document (if the file does not load to the right.)

Print Friendly, PDF & Email