What’s in the Joint Application?
Constitution Pipeline (CP) is applying for a 401 water quality certificate and four water related permits. They have submitted a joint application to both the NYSDEC and USACE for all five. There are 70 PDFs in the joint application – almost 4,400 pages.

  1. Calculations

    • Engineering calculations of runoff based on assumptions in file 51.
    • Everything in application is based on a 5-year storm event.
    • This is an unsubstantiated assumption. For calculations see files 52 – 56.
    • Constitution-NY-JointApp_Att-G_WaterCrossCalcs: 3of7, 4of7, 5of7, 6of7, and 7of7
  2. Constitution-NY-JointApp_Att-A_ApplicationForms_Aug-2014

    • Above ground historic survey report not completely filled out. (6 pages)
  3. Constitution-NY-JointApp_Att-B_Figures_Aug-2014_01of2

    • overview maps showing DEC regions (2 pages)
    • topo maps of the route (22 pages)
    • hydrologic map / code (p 25)
  4. Constitution-NY-JointApp_Att-B_Figures_Aug-2014_02of2

    • topo maps showing stream classifications (p. 1-22, MP 25–124)
    • aerial maps showing NYS regulated wetlands (p. 23-44)
  5. Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_01of28

    • Key to location of alignment sheets, and key to graphic details (p. 2-5)
    • Alignment sheets show the construction plans for each parcel of land along the route.
    • There are 27 more files of the alignment sheets (files 6_ through 25_ )
  6. Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_02of28

    • -Alignment sheet. See description under file # 5.
  7. Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_03of28

    • -Alignment sheet. See description under file # 5.