What’s in the Joint Application?
Constitution Pipeline (CP) is applying for a 401 water quality certificate and four water related permits. They have submitted a joint application to both the NYSDEC and USACE for all five. There are 70 PDFs in the joint application – almost 4,400 pages.
-
- Engineering calculations of runoff based on assumptions in file 51.
- Everything in application is based on a 5-year storm event.
- This is an unsubstantiated assumption. For calculations see files 52 – 56.
- Constitution-NY-JointApp_Att-G_WaterCrossCalcs: 3of7, 4of7, 5of7, 6of7, and 7of7
-
Constitution-NY-JointApp_Att-A_ApplicationForms_Aug-2014
- Above ground historic survey report not completely filled out. (6 pages)
-
Constitution-NY-JointApp_Att-B_Figures_Aug-2014_01of2
- overview maps showing DEC regions (2 pages)
- topo maps of the route (22 pages)
- hydrologic map / code (p 25)
-
Constitution-NY-JointApp_Att-B_Figures_Aug-2014_02of2
- topo maps showing stream classifications (p. 1-22, MP 25–124)
- aerial maps showing NYS regulated wetlands (p. 23-44)
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_01of28
- Key to location of alignment sheets, and key to graphic details (p. 2-5)
- Alignment sheets show the construction plans for each parcel of land along the route.
- There are 27 more files of the alignment sheets (files 6_ through 25_ )
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_02of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_03of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_04of28
- -Alignment sheet