What’s in the Joint Application?
Constitution Pipeline (CP) is applying for a 401 water quality certificate and four water related permits. They have submitted a joint application to both the NYSDEC and USACE for all five. There are 70 PDFs in the joint application – almost 4,400 pages.
-
- Engineering calculations of runoff based on assumptions in file 51.
- Everything in application is based on a 5-year storm event.
- This is an unsubstantiated assumption. For calculations see files 52 – 56.
- Constitution-NY-JointApp_Att-G_WaterCrossCalcs: 3of7, 4of7, 5of7, 6of7, and 7of7
-
Constitution-NY-JointApp_Att-A_ApplicationForms_Aug-2014
- Above ground historic survey report not completely filled out. (6 pages)
-
Constitution-NY-JointApp_Att-B_Figures_Aug-2014_01of2
- overview maps showing DEC regions (2 pages)
- topo maps of the route (22 pages)
- hydrologic map / code (p 25)
-
Constitution-NY-JointApp_Att-B_Figures_Aug-2014_02of2
- topo maps showing stream classifications (p. 1-22, MP 25–124)
- aerial maps showing NYS regulated wetlands (p. 23-44)
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_01of28
- Key to location of alignment sheets, and key to graphic details (p. 2-5)
- Alignment sheets show the construction plans for each parcel of land along the route.
- There are 27 more files of the alignment sheets (files 6_ through 25_ )
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_02of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_03of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_04of28
- -Alignment sheet. See description under file # 5.
-
9_ Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_05of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_06of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_07of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_08of28
- Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_09of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_10of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_11of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_12of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_13of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_14of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_15of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_16of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_17of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_18of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_19of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_20of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_Alignment Sheets_Aug-2014_21of28
- -Alignment sheet. See description under file # 5.
-
Constitution-NY-JointApp_Att-C_BMP’s_Aug-2014_22of28
- NYS Best Management Practices (BMPs) part 1 (p 1-20)
- Paper diagrams meant to avoid impacts in the real world.
- “The best laid plans of mice and men oft go astray.”
-
Constitution-NY-JointApp_Att-C_BMP’s_Aug-2014_23of28
- NYS Best Management Practices (BMPs) part 2 (p 1-3) (19 pages)
- Paper diagrams meant to avoid impacts in the real world.
- NY sediment barrier summary – a table listing what they will use where (p. 4-10)
- NY flume pipes summary – tables listing waterbody crossings / details (p. 11-15)
- NY diversion swale summary – table listing water diversions (p. 16-17)
- NY miscellaneous sediment and erosion control / estimated quantities (p. 18-19)
- Table summarizes crossings and techniques.
- “The best laid plans of mice and men oft go astray.”
-
Constitution-NY-JointApp_Att-C_West Fall Meter Station_Aug-2014_24of28
- erosion, sediment control and layout plans for Westfall Meter and PAR (8 pages)
-
Constitution-NY-JointApp_Att-C_Contractor Yards_Aug-2014_25of28
- text, graphics, drawings of contractor yards (14 pages)
-
Constitution-NY-JointApp_Att-C_Access Roads_Aug-2014_26of28
- text, graphics, drawings of access roads (34 pages)
-
Constitution-NY-JointApp_Att-C_Access Roads_Aug-2014_27of28
- text, graphics, drawings of access roads (36 pages)
-
Constitution-NY-JointApp_Att-C_Access Roads_Aug-2014_28of28
- text, graphics, drawings of access roads (32 pages)
-
Constitution-NY-JointApp_Att-D_FigA_FreeSpanBridge_Aug-2014_01of2
- text and graphics of free span bridge (3 pages)
-
Constitution-NY-JointApp_Att-D_ISMP_NY_Aug-2014_02of2
- NY Invasive species management plan (395 pages)
-
Constitution-NY-JointApp_Att-E_Waterbody-WetlandSiteSpec_Aug-2014_01of14
- Drawings of waterbody crossings (46 pages, MP 26-42)
-
Constitution-NY-JointApp_Att-E_Waterbody-WetlandSiteSpec_Aug-2014_02of14
- Drawings of waterbody crossings (42 pages, MP 42-63)
-
Constitution-NY-JointApp_Att-E_Waterbody-WetlandSiteSpec_Aug-2014_03of14
- Drawings of waterbody crossings (45 pages, MP 64-95)
-
Constitution-NY-JointApp_Att-E_Waterbody-WetlandSiteSpec_Aug-2014_04of14
- Drawings of waterbody crossings (41 pages, MP 95-124)
-
Constitution-NY-JointApp_Att-E_Waterbody-WetlandSiteSpec_Aug-2014_05of14
- Drawings of wetland crossings (50 pages, MP 26-39)
-
Constitution-NY-JointApp_Att-E_Waterbody-WetlandSiteSpec_Aug-2014_06of14
- Drawings of wetland crossings (52 pages, MP 39-50)
-
Constitution-NY-JointApp_Att-E_Waterbody-WetlandSiteSpec_Aug-2014_07of14
- Drawings of wetland crossings (50 pages, MP 50-65)
-
Constitution-NY-JointApp_Att-E_Waterbody-WetlandSiteSpec_Aug-2014_08of14
- Drawings of wetland crossings (54 pages, MP 65-88)
-
Constitution-NY-JointApp_Att-E_Waterbody-WetlandSiteSpec_Aug-2014_09of14
- Drawings of wetland crossings (52 pages, MP 90-105)
-
Constitution-NY-JointApp_Att-E_Waterbody-WetlandSiteSpec_Aug-2014_10of14
- Drawings of wetland crossings (50 pages, MP 106-123)
-
Constitution-NY-JointApp_Att-E_Waterbody-WetlandSiteSpec_Aug-2014_11of14
- Drawings of waterbodies and wetlands impacted by access roads (20 pages, MP 26-53)
-
Constitution-NY-JointApp_Att-E_Waterbody-WetlandSiteSpec_Aug-2014_12of14
- Drawings of waterbodies and wetlands impacted by access roads (20 pages, MP 54-72)
-
Constitution-NY-JointApp_Att-E_Waterbody-WetlandSiteSpec_Aug-2014_13of14
- Drawings of waterbodies and wetlands impacted by access roads (20 p, MP 72-120)
-
Constitution-NY-JointApp_Att-E_Waterbody-WetlandSiteSpec_Aug-2014_14of14
- Drawings of waterbodies and wetlands impacted by contractor yards (14 pages)
-
Constitution-NY-JointApp_Att-F_AgencyCorrespondence_Aug-2014
- letters and emails re contractor yards and towers +. (34 pages)
- DEC – species of concern – caveat re: accuracy of database – pages 11-15
-
Constitution-NY-JointApp_Att-G_HHA-SiltFenceDesignSum-Aug-2014_01of7
- silt fence design criteria. Table listing sites and requirements (48 pages)
- Will these flimsy fences hold back torrential rains?
-
Constitution-NY-JointApp_Att-G_HHA-WaterCrossingsCalcs_Aug-2014_02of7
- Hydrologic and hydraulic calculations for waterbody crossings (20 pages)
- Text: “A 2-year design, a 5-year, and a 10-year maximum design storm were
- utilized for all watershed classifications with the 5-year as the design storm.” (p. 4)
- Table listing all streams and width and length of pipe for diversion. (15 pages)
- Check the rainfall assumptions.
-
Constitution-NY-JointApp_Att-G_WaterCrossCalcsMP23.11-34_03of7
- Engineering calculations (245 pages – MP 23.11-34)
-
Constitution-NY-JointApp_Att-G_WaterCrossCalcsMP34-52_04of7
- Engineering calculations (359 pages – MP 34-52)
-
Constitution-NY-JointApp_Att-G_WaterCrossCalcsMP52-74_05of7
- Engineering calculations (360 pages – MP 52-74)
-
Constitution-NY-JointApp_Att-G_WaterCrossCalcsMP74-100_06of7
- Engineering calculations (352 pages – MP 74-100) (ex: map on p. 169)
-
Constitution-NY-JointApp_Att-G_WaterCrossCalcsMP100-122_07of7
- Engineering calculations (360 pages – MP 100-122)
-
Constitution-NY-JointApp_Att-H_WetlandDelinReport-Aug-2014
- Methodology + 7 pages of tables of surveyed wetlands (how many not?) (17 pages)
- Delineations (582 pages total)
-
Constitution-NY-JointApp_Att-I_LandownerLineList-SurveyStatus_Aug-2014
- Survey status. (17 pages)
- Colored diagram of surveyed (green), partial (purple), unsurveyed (red) (p. 13-17)
-
Constitution-NY-JointApp_Att-J_MasterTableWetlandWaterbodies_Aug-2014
- Table of waterbody and wetlands – integrated data. Large format. (31 pages)
-
Constitution-NY-JointApp_Att-K_WetlandMitigationPlan_Aug-2014_01of3
- Wetlands mitigation plan (259 pages)
- Mitigation (p. 41-52)
- NYSDEC wetlands impacts / proposed mitigation (p 53 -)
- Summary table listing surveyed wetlands v remote sensing (p 69)
- Aerial images with descriptions (p 71-)
- Proposed mitigation, Betty Brook, in Delaware Watershed. (p. 116-120)
- Wetland impact tables (p.121-210)
- Mitigation site plan – N. Broome County (211-259) Owned by Nornew. (p. 227)
-
Constitution-NY-JointApp_Att-K_WetlandMitigationPlan_Aug-2014_02of3
- The Betty Brook mitigation site and plan (50 pages)
-
Constitution-NY-JointApp_Att-K_WetlandMitigationPlan_Aug-2014_03of3
- The Beckers Corners mitigation site and plan (105 pages)
-
Constitution-NY-JointApp_Att-Q_TroutStreamCrossReport and Attach_Aug-2014
- Trout stream restoration report (101 pages)
- Priority category – MOST PROBLEMATIC –steep slopes, etc (p 13-29)
- Stream restoration BMPs (p 30-8)
- Site field visits for problematic streams / photos (p. 39-100)
- Table of priority 1 streams with 100 year floods.
-
Constitution-NY-JointApp_Att-R_Wetland-WaterCrossMethodChange_Aug-2014
- Changes in crossing techniques to open cut. (2 pages)
-
Constitution-NY-JointApp_Att-S_AgencyRequestedRouteMods and Status_Aug-2014_01of2
- Agency requested route modifications + minor route deviation maps (24 pages)
-
Constitution-NY-JointApp_Att-S_AgencyRequestedRouteMods and Status_Aug-2014_02of2
- Minor route deviation maps (10 pages)
-
67_B_2013 version_Constitution-NY-JointApp_ProjectNarrative_Nov-2013
- Not adequate for public interest review under Clean Water Act.
- Preemption statement does not apply to 401 certificate under federal CWA.
- 67_Constitution-NY-JointApp_ProjectNarrative_Aug-2014
- 101 pages
- Section 1 – refers back to November 2013 narrative – not changed (downloaded)
-
- 1 page cover – see file 33 for drawing
-
NYSDEC Central Office SuppInfo#2 Cover Letter_Final_08122014
- cover letter to DEC re: the August 2014 resubmittals – what was changed (7 pages)
-
USACE NY District SuppInfo#2 Cover Letter_Final_08122014
- cover letter to ACE re: the August 2014 resubmittals – what was changed (7 pages)